This is a revolutionary tensegrity structure system that combines artistic beauty with engineering principles, applicable to various scenarios including exhibition displays, architectural decoration, and space design.





Structural Type: Stadium Stand Ceiling Structure
Project scope:
Project size: 24750 square feet
Material: PTFE membrane
Location: Frisco, Texas
Completion date: 2018
Segmented Market: Sports Facilities
Owner: Frisco Soccer LP
General contractor: Manhattan Construction
Architect: HKS
engineer:
Photo source: Gary Taylor
The National Football Hall of Fame is part of a $40 million renovation project at Toyota Stadium, initiated by Dallas Football Club, Frisco City, Frisco Independent School District, and the American Football Federation. It is a public-private partnership project.
Project Highlights
The roof structure covers an area of 24750 square feet and can accommodate nearly 3000 high-quality seats
Expanded multi-purpose game day changing room with 200 storage cabinets;
Two field level player passages allow teams to leave separately through the fan area;
Lamar Hunter US Open Bar – a club space offering casual food and beverage options, overlooking a glass enclosed press conference area and locker room exit passage;
The banquet space in the Hall of Fame club area offers premium food and beverage experiences, with seating capacity for up to 700 guests for events
The 3000 square foot FC Dallas store will also offer football specific merchandise;
1389 square feet of additional video boards, including two in stadium video boards, will increase the footprint of Toyota Stadium video boards to approximately 7512 square feet, slightly larger than two NBA standard basketball courts
| Specification | Small (1.2m) | Medium (2.4m) | Large (3.6m) |
|---|---|---|---|
| Height | 1200mm | 2400mm | 3600mm |
| Max Diameter | 800mm | 1600mm | 2400mm |
Open the package, check that all components are complete, and verify against the parts list in the manual. Prepare required tools: hex key, tape measure, and gloves.
First assemble the base frame, ensuring all connections are secure. Install the main support structure in numerical order. Do not fully tighten all fasteners to allow for later adjustments.
Install the tension cables and gradually adjust tension in each part to ensure structural balance and stability. Use a level to check verticality and make fine adjustments if necessary.